How Do You Prepare a Building Site for Timber Frame Houses?

30. May 2019
  • linkedin
  • Facebook
Preparing a building site by taking into consideration different stages of the built is essential for a timely and efficient process.
30. May 2019
  • linkedin
  • Facebook
jelovica-building-process12

Foundation for a Timber Frame House

Even prefabricated houses need a cement foundation to support themselves. The foundation can be made in different ways, usually, it is made of reinforced concrete. The foundation must dry well before assembly, so we suggest that it is finished at least 28 days earlier. That’s why I usually ask the end customer to provide me with photographic documentation.

The size of the foundation is indicated on the project, but we know that in reality there are always discrepancies.

The maximum height tolerance for the stalls is +/- 1cm. This is because the prefabricated walls are attached to the foundation with anchors and they have statically limits in height. It is also important that the foundation is waterproofed!

Reinforced concrete foundation with scaffolding.

Space for Delivert Trucks

It is very important that when trucks with walls arrive at the construction site, they have space to maneuver and park the closest to the foundation of the house being assembled. The trucks usually used for transport are truck size: 15m length. So we suggest ensuring a minimum passage height of 4. 20m, width 3. 20m and length 16m.

Remove or move any obstructions such as electricity or telephone cables, trees, and shrubs to leave enough space for trucks and also for wall or roof storage.
I would also remind you that trucks can weigh up to 24 tonnes, so the ground must already be prepared for these heavy goods vehicles. It’s usually done under a gravel pitch.

Road closure and assembly with crane.

Truck / Crane for Wooden House Assembly

For lifting the prefabricated timber frame elements, which can weigh up to 2 tons, you will need a crane. You can use a construction crane or even a crane truck. The 15-metre long arm must have a capacity of at least 2 tonnes, although this is very much dependent on the project in question. If there is a construction crane provide solid support on the ground.

Space for Building Materials

Along with the walls, ceilings, and roof, the house is also provided with many building elements, for which it is necessary to provide space where to place them. For this reason, we suggest having a place near the stage prepared to support elements at least 14m long and at least 6m wide. We also suggest that this soil be either crushed gravel or concrete. If there is a road nearby and the customer does not have the necessary space for support or the parking of the truck, the road must be closed in time for the assembly to take place.

Building materials in different parts of the construction site.

CONSTRUCTION FENCE

Coustruction Fence

The territory around the building shall be fenced. This is a mandatory requirement to guarantee occupational safety. The height shall be at least 2 metres and the gates necessary for the passage of heavy goods vehicles shall also be provided.

Wooden House Assembly: What if it Rains or Snows?

Prefabricated wooden houses can be assembled all months of the year. Sometimes it happens that it may rain or snow during assembly. In these cases, it is necessary to stop the assembly and close the elements with suitable sheets.

Covering with PVC sheets of prefabricated walls during rain.

What is the Cost of a Prefabricated Wooden House?
6 Reasons Why Choose a Wooden House

Want to stay up to date?

Trust us with your email address so we can keep you in the loop about our new projects and solutions. No spam or adverts, we promise.
Just one more step!
Confirm your registration!
Something went wrong.
Something went right.
Please check your inbox. We have sent you an email to confirm your email address.
No email? Please resend.
znak-jelovica-footer

Our work

Services
Systems & Solutions
Reference
Expertise

Company

About
Green Company
Contact
News

Legal

Terms & Conditions
Cookie Policy
Copyright © Jelovica hiše d.o.o.,
Hrib 1, 4205 Preddvor, Slovenia
Cookies Manage cookies

We use cookies to improve your browsing experience, display personalized ads or content, and analyze our traffic. By clicking “Allow all”, you agree to our use of cookies.

Necessary cookies
These cookies are essential for the operation of the website and cannot be switched off in our systems. They are usually only set in response to your actions that lead to service requests, such as privacy settings, logging in or filling out forms. You can set your browser to block or warn you about these cookies. In this case, some parts of the website will not work.
Performance cookies
We use these cookies to count visits and traffic sources so that we can measure and improve the performance of our website. They help us identify which areas are most and least popular and how visitors navigate the website. The information collected by cookies is aggregated and anonymous. If you refuse these cookies, we will not know when you have visited our website.
Targeting cookies
These cookies are set by our advertising partners. The advertising partners may use them to build a profile of your interests, which they then use to show you relevant ads on other websites. They work by uniquely identifying your browser and device. If you refuse to use these cookies, you will not receive targeted online advertising from us.